Risk Assessment of Coal Mine Gas Explosion Based on IAHP-Unascertained Measure
In order to quantify the coal mine gas explosion risk and solve the shortage of uncertainty treatment in the process of analysis, a coal mine gas explosion risk assessment method based on IAHP-unascertained measure theory is proposed. First, the main risk indicators affecting gas explosion are determined based on the expert experience, and the risk assessment index system structure model is built. Then, the weight of each influence index is calculated by IAHP method. At the same time, based on the unascertained measure theory, the information with uncertainty and fuzziness is quantitatively analyzed, the index measure function is constructed, and the index measure matrix of the structural model is obtained. Finally, the risk level is determined based on the confidence criterion. The results show that management factor is the most influential factor among the four primary indexes, which is the key risk factor leading to coal mine gas explosion. Among the 20 secondary indexes, safety technology and input are the most influential, followed by the average length of service of employees, ventilation system and safety culture. Coal mines should pay attention to the important role of these factors in the mine safety production unit. The least influence is spontaneous ignition period and coal seam explosion index. According to the actual mining situation of the coal mine, the gas explosion risk assessment was carried out on 5 working faces, and the evaluation grades were respectively safe, relatively safe, relatively safe, relatively safe, and relatively safe. The evaluation results were consistent with the actual project, and based on the evaluation model, certain theoretical guidance could be provided for the decision makers to effectively control the gas explosion risk in the coal mine.
Gas explosion
煤矿瓦斯爆炸是在多种因素的共同作用下形成的极为复杂的灾害事故,同时也是威胁我国煤矿安全生产的重大灾害事故之一
诸多学者针对煤矿瓦斯爆炸风险评估进行了大量研究,例如:李润求等
王光远教授在1990年首次提出未确知测度理论,在分析不确定因素信息的同时,还能进行量化处理,在解决有序切割的问题上有着显著优势
IAHP是AHP的一种改进和扩展,该方法通过区间数对比两两因素之间的重要程度,在建立判断矩阵中采用数值区间替代单数值,有效解决了决策者因信息掌握不全而造成判断矩阵不准确的问题。IAHP的计算过程与AHP一致,即首先确定与分析问题有关的影响因素,然后根据是否具有某些特征把这些因素聚集成组,将它们的共同特征作为系统中新层次的因素,同时这些因素也根据另外一组的特性构成更高层次的因素,最终形成单一的最高因素即分析目标,由此构建层次分析结构模型
1) 根据煤矿瓦斯爆炸建立层次分析结构。层次分析模型应包含目标层、准则层和指标层。
2) 确定判断矩阵。通过多位专家评判,采用二元对比法,明确每个层次中各元素的相对重要性。
(1)
其中:A为区间矩阵, 和 为A所确定的矩阵; 和 分别为矩阵 和矩阵 的元素,且 , ; 表示利用二元对比法得到的元素 与元素 之间的相对重要性;n表示指标个数。
3) 区间判断矩阵的一致性检验。
(2)
(3)
(4)
式中: 为最大特征值; 为特征向量M的元素;k和 均为修正系数; 和 分别为矩阵 与矩阵 的最大特征根所对应的特征向量;Q为所计算出的权重范围。
4) 确定各影响因素权重。
(5)
式中 为层次结构模型中各指标的权重,通过式(2)~式(5)检查权重的分布是否在合理范围。
假设有n个待评价的对象
,则评价对象空间
,每个评价对象包含有m个评价指标
,则指标空间
,第i个评价对象关于第j个评价指标的测度值为
。对每个测度值设定c个评价等级
,则等级空间
,若满足
或
,则称
是评价等级空间U的一个有序分割类
令 表示指标测度值 属于第k个评价等级 的程度,当 满足:
(6)
(7)
(8)
则称 为未确知测度。其中式(8)表示“归一性”,式(9)表示“可加性”。所有测度值所构成的矩阵称为单指标未确知测度评价矩阵。
(9)
令 表示 属于第k个评价类 的程度,则
(10)
由于 ,且 ,所以 是未确知测度,矩阵
(11)
称为多指标综合测度评价矩阵, 称为评价对象 的综合测度评价向量。
在求出多指标综合测度评价矩阵的条件下,如果 是评价等级空间U的一个有序分割,即可引入置信度识别准则。假设置信度为 ( ,且常取0.6或0.7), ,令
(12)
则认为评价对象 属于第 个评价类 。
建立瓦斯爆炸风险指标体系是对瓦斯爆炸进行风险评估的首要条件,也是评估结果可靠程度的主要影响因素。基于煤矿瓦斯爆炸事故的致灾机理和形成条件,将危险源理论和事故致因理论相结合,考虑“人–机–环境–管理”四个因素建立瓦斯爆炸风险评估指标体系
根据常用的分级标准与专家经验及评价指标的意义,同时考虑具体的实际情况,将煤矿瓦斯爆炸风险等级划分为安全、较安全、一般安全、较不安全和不安全5个评价等级,分别用P1,P2,P3,P4,P5表示。由于煤矿安全生产的特殊性和井下环境的复杂性,加之瓦斯爆炸受多种因素的综合影响,依据各指标的不同属性,其分级标准见
指标 |
等级区间 |
||||
P1(安全) |
P2(较安全) |
P3(一般安全) |
P4(较不安全) |
P5(不安全) |
|
X11; X21; X22; X23; X24; X25; X32; X41; X42; X43; X44 |
[90, 95) |
[85, 90) |
[75, 85) |
[65, 75) |
[50, 65) |
X12 |
[15, 16) |
[12, 15) |
[9, 12) |
[6, 9) |
[3, 6) |
X13 |
[120, 180) |
[100, 120) |
[60, 100) |
[30, 60) |
[20, 30) |
X14 |
[16, 20) |
[12, 16) |
[8, 12) |
[4, 8) |
[2, 4) |
X31 |
[2, 4) |
[4, 5) |
[5, 7) |
[7, 10) |
[10, 12) |
X33 |
[4, 5) |
[5, 6) |
[6, 8) |
[8, 10) |
[10, 12) |
X34 |
[95, 100) |
[90, 95) |
[85, 90) |
[80, 85) |
[75, 80) |
X35 |
[9, 12) |
[6, 9) |
[5, 6) |
[4, 5) |
[2, 4) |
X36 |
[8, 10) |
[10, 14) |
[14, 15) |
[15, 18) |
[18, 20) |
X37 |
[0.4, 0.5) |
[0.5, 0.6) |
[0.6, 0.7) |
[0.7, 0.8) |
[0.8, 0.9) |
基于评价指标分级标准,同时咨询多位专家及经验丰富的煤矿作业人员,综合考虑其所给意见,采用二元对比法构造出区间判断矩阵,一级指标区间判断矩阵如
一级指标 |
X1 |
X2 |
X3 |
X4 |
X1 |
[1, 1] |
[1, 2] |
[1, 2] |
[1/2, 1] |
X2 |
[1/2, 1] |
[1, 1] |
[1, 2] |
[1/2, 1] |
X3 |
[1/2, 1] |
[1/2, 1] |
[1, 1] |
[1/2, 1] |
X4 |
[1, 2] |
[1, 2] |
[1, 2] |
[1, 1] |
一级指标 |
|
X1 |
0.2673 |
X2 |
0.2248 |
X3 |
0.1890 |
X4 |
0.3179 |
一致性检验 |
k = 0.8715 < 1,β = 1.1265 > 1,满足一致性检验 |
一级指标 |
一级指标权重 |
二级指标 |
二级指标权重 |
综合权重 |
X1 |
0.2673 |
X11 |
0.1570 |
0.0420 |
X12 |
0.3234 |
0.0864 |
||
X13 |
0.1320 |
0.0353 |
||
X14 |
0.3845 |
0.1028 |
||
X2 |
0.2248 |
X21 |
0.4211 |
0.0947 |
X22 |
0.2756 |
0.0620 |
||
X23 |
0.1644 |
0.0370 |
||
X24 |
0.0849 |
0.0191 |
||
X25 |
0.0514 |
0.0116 |
||
X3 |
0.1890 |
X31 |
0.2124 |
0.0402 |
X32 |
0.0944 |
0.0178 |
||
X33 |
0.1604 |
0.0303 |
||
X34 |
0.2124 |
0.0402 |
||
X35 |
0.0238 |
0.0045 |
||
X36 |
0.0295 |
0.0056 |
||
X37 |
0.2647 |
0.0500 |
||
X4 |
0.3179 |
X41 |
0.1204 |
0.0383 |
X42 |
0.1801 |
0.0572 |
||
X43 |
0.4172 |
0.1326 |
||
X44 |
0.2818 |
0.0896 |
根据
图2. 评价指标测度函数图
运用IAHP-未确知测度评价模型对贾宝山
工作面编号 |
X11 |
X12 |
X13 |
X14 |
X21 |
X22 |
X23 |
X24 |
X25 |
X31 |
X32 |
X33 |
X34 |
X35 |
X36 |
X37 |
X41 |
X42 |
X43 |
X44 |
1# |
95 |
12.18 |
183 |
26.05 |
95 |
95 |
95 |
95 |
95 |
11.21 |
95 |
6.36 |
105 |
6.5 |
22.34 |
0.51 |
95 |
95 |
95 |
90 |
2# |
95 |
11.56 |
163 |
21.32 |
90 |
90 |
90 |
90 |
90 |
10.16 |
90 |
5.10 |
100 |
7.2 |
21.12 |
0.56 |
90 |
95 |
95 |
90 |
3# |
90 |
10.84 |
151 |
19.58 |
95 |
95 |
95 |
90 |
90 |
12.45 |
85 |
9.53 |
100 |
6.6 |
20.51 |
0.76 |
90 |
95 |
90 |
90 |
4# |
90 |
13.31 |
193 |
24.50 |
95 |
95 |
95 |
95 |
90 |
16.01 |
95 |
7.93 |
105 |
8.8 |
22.34 |
0.41 |
95 |
95 |
95 |
90 |
5# |
95 |
11.85 |
171 |
23.34 |
90 |
95 |
95 |
95 |
95 |
6.12 |
85 |
4.01 |
98 |
9.5 |
19.89 |
0.68 |
90 |
95 |
90 |
90 |
以1#工作面为例,将各因素取值代入测度函数图中,根据式(9)可得到1#工作面人为因素的单指标测度矩阵,同理可得到设备因素、环境因素和管理因素的测度矩阵。
结合区间层次分析法所确定的各指标权重,由式(10)求出1#工作面的多指标综合评价向量,代入式(12),其中取
,求出k值,得到煤矿瓦斯爆炸风险等级评估结果见
工作面编号 |
综合评价指标测度 |
k值 |
等级 |
||||
1# |
0.7355 |
0.1246 |
0.0905 |
0.0160 |
0.0305 |
1 |
P1 |
2# |
0.4843 |
0.3778 |
0.0764 |
0.0497 |
0.0088 |
2 |
P2 |
3# |
0.3643 |
0.3988 |
0.1016 |
0.0867 |
0.0457 |
2 |
P2 |
4# |
0.6869 |
0.1861 |
0.0782 |
0.0000 |
0.0457 |
2 |
P2 |
5# |
0.4167 |
0.4079 |
0.1625 |
0.0074 |
0.0025 |
2 |
P2 |
由
导致事故的危险因素,实际情况与评估结果基本吻合,说明运用IAHP-未确知测度模型对煤矿瓦斯爆炸风险进行等级评估是可行的。
1) 本文提出了一种基于IAHP-未确知测度的煤矿瓦斯爆炸风险评估方法,该方法利用IAHP确定煤矿安全生产系统中影响瓦斯爆炸的各评价指标权重,模型简单且操作容易,通过区间数的模糊性及不确定性,使所计算的指标权重更加客观、准确。同时,基于未确知测度函数对定性与定量指标进行评价,均满足“归一性”和“可加性”。两种方法结合,使评价过程更为科学严谨,为煤矿瓦斯爆炸风险评估提供了研究思路和科学依据。
2) 针对瓦斯爆炸事故本身的不确定性及矿井信息的未确知性,从人、机、环、管4个方面构建评价体系,将煤矿瓦斯爆炸风险划分为5个等级,为瓦斯爆炸风险水平的测度提供一定的基础。通过IAHP所计算权重与多指标综合测度评价矩阵的乘积可确定5个工作面的评价结果分别为安全、较安全、较安全、较安全和较安全,该评价结果符合现场工程实际,说明评价方法较为合理,对煤矿瓦斯爆炸风险评估具有一定的应用价值。
3) 在后续研究中,可将该模型结合到更多矿区及不同工作面的现场实际数据中,进一步验证其可靠性,以提高该模型的精确度和普适性,提高所述方法的评价和预测水平。
国家自然科学基金项目“矿井多爆源瓦斯爆炸传播特性及热冲击动力学机制研究”(编号:52174178)、“矿井瓦斯爆炸能量释放转化特性及热冲击能量耗损研究”(编号:52174177)。