水电站可将水能资源转化为电能。揭示宏观的水能关系,可直接实现流域内电站的发电量与水资源量的相互估算,为简单、快捷实现水–能相互转化提供依据。选取长江上游21座大型梯级水电站群为研究对象,分别采用常规调度和确定性优化调度方式,得到模拟调度结果,由此建立了年尺度的水–能转化关系。研究发现:1) 各水电站的出库流量与其发电量线性关系显著;2) 流域总水资源量与梯级水电站群总发电量也存在线性关系;3) 以各水电站总装机容量作为权重,水能关系拟合效果更佳。提出的方法为依据发电量估计水资源量或依据水资源量估算发电量提供了新途径。
Hydropower stations convert water energy into electricity. The estimation of hydropower generation of power stations and water resources of basins from each other can be directly implemented in a simple way, which provides a basis for water-energy conversion. The 21 large-scale cascade hydropower stations in upper reaches of the Yangtze River were selected as the case study, and the conventional and deterministic optimization operations were used to simulate reservoir operation, and then the water-energy conversion relationship was established. The results show that: 1) the linear relationship between the outflow and power generation is significant for a single hydropower station; 2) there is a linear relationship between the total water resources of the basin and the total power generation of the cascade hydropower stations and 3) the water energy relationship has a better goodness of fitting when the installed capacity is used as the weight. The proposed method provides a new way to estimate the amount of water resources based on power generation, and to estimate the power generation from water resources.
龚文婷,刘攀*
武汉大学水资源与水电工程科学国家重点实验室,湖北 武汉
收稿日期:2019年12月18日;录用日期:2019年12月31日;发布日期:2020年1月7日
水电站可将水能资源转化为电能。揭示宏观的水能关系,可直接实现流域内电站的发电量与水资源量的相互估算,为简单、快捷实现水–能相互转化提供依据。选取长江上游21座大型梯级水电站群为研究对象,分别采用常规调度和确定性优化调度方式,得到模拟调度结果,由此建立了年尺度的水–能转化关系。研究发现:1) 各水电站的出库流量与其发电量线性关系显著;2) 流域总水资源量与梯级水电站群总发电量也存在线性关系;3) 以各水电站总装机容量作为权重,水能关系拟合效果更佳。提出的方法为依据发电量估计水资源量或依据水资源量估算发电量提供了新途径。
关键词 :水–能转化关系,水库调度,梯级水电站群
Copyright © 2020 by author(s) and Wuhan University.
This work is licensed under the Creative Commons Attribution International License (CC BY).
http://creativecommons.org/licenses/by/4.0/
随着环境保护和生态文明建设的稳步推进,清洁能源已逐渐取代传统能源,成为能源发展建设中的重点 [
上述研究以提高水能转化的效率为目的,缺乏水量与电能的宏观关系。若能建立宏观各水电站乃至整个流域的水–能转化关系,则可实现流域各水电站的发电量与水资源量的相互估算,为描述水–能纽带关系提供简单快捷的途径 [
在水电站的中长期调度中,水力发电通常采用如下公式进行计算:
E = N ⋅ t = k ⋅ q ⋅ h ⋅ t (1)
式中:E代表电站所发电能,N为电站出力,t为时间长度,k为水电站的综合出力系数,q代表发电流量,h代表净水头。
假设不考虑弃水,出库流量等于发电流量。现对上述公式在(q0,h0)处进行泰勒展开,简化为如下线性关系 [
E = k ( q 0 ⋅ h 0 + h 0 ( q − q 0 ) + q 0 ( h − h 0 ) + H O T ) ⋅ t (2)
式中:HOT为高阶项,可忽略不计。
E = k ( h 0 q + q 0 h − q 0 h 0 ) ⋅ t (3)
在年尺度上,尽管在年内水头会有一定幅度的变化,但多年平均水头h变化不大,可计为常数,现令 a = k ⋅ h 0 , b = k ⋅ q 0 ⋅ h − q 0 ⋅ h 0 则:
E = ( a ⋅ q + b ) ⋅ t (4)
式中:a,b均为与各水电站特性相关的参数,参数a为水电站电能转化效率,参数b为公式线性化时的截距。
基于水电站群的聚合原理,可将流域所有水电站聚合为一个虚拟的水电站 [
E 总 = N 总 ⋅ t = ( A ⋅ Q + B ) ⋅ t (5)
式中: N 总 为流域各水电站出力之和,A为流域总的水能转化效率,B为公式线性化时对应的截距,Q为流域水资源总量。
以上式为基础,统计各电站发电总量,可反推求流域的出库流量,并以此作流域水资源量。
为将上述水能关系的具体化,现采用常规调度和确定性优化调度两种调度方式,对梯级水电站群进行模拟调度,建立流域各水电站出力和出库流量的水–能转化关系。
在常规调度中,各水电站可按常规调度图或者简化运行策略进行调度,并综合考虑部分水电站的调度规程要求。
以调度周期内梯级电站的发电量最大为目标,建立梯级水电站群联合发电优化调度模型,目标函数为:
E = max ∑ k = 1 M E i (6)
式中:k为水电站编号,M为水电站个数。
在进行调度时,不论是常规调度还是优化调度,均要考虑以下约束条件:
1) 水量平衡约束:
V i + 1 , j = V i , j + ( I i , j − Q i , j ) ⋅ t (7)
式中:i为时段数,j为水电站数,Vi,j即为第j个水电站在第i个时段的库容,Ii,j和Qi,j分别为水电站的入库流量和出库流量。
2) 水电站库容约束:
V L i , j ≤ V i , j ≤ V U i , j (8)
式中:VLi,j和VUi,j分别为水电站库容的上下限。
3) 水电站出库流量约束:
Q L i , j ≤ Q i , j ≤ Q U i , j (9)
式中:QLi,j和QUi,j分别为水电站出库流量的上下限。
4) 水电站出力约束:
P L i , j ≤ P i , j ≤ P U i , j (10)
式中:PLi,j和PUi,j分别为水电站出力的上下限。
5) 非负约束及其他约束。
在优化调度中,由于上下游梯级水电站间往往具有复杂的水力、电力联系 [
图1. 长江上游水电站群概况
长江上游有着丰富的水力资源 [
选取1957~2012年为计算时段,以旬为计算时段长进行常规调度和优化调度,调度结果如表1所示。其中设计值为21座水电站年设计发电量的累加值。以该设计值为基准,常规调度的发电增长率为40.9%,优化调度较常规调度的发电增长率为7.6%。调度结果表明:由于考虑了不同水库间联合调度时的径流补偿,常规调度及优化调度的效益大幅度提升,但常规调度和优化调度方式的差异不大(相差7.9%)。
调度方式 | 多年平均发电量(亿kWh) | 发电增长率(%) |
---|---|---|
设计值 | 2207.3 | |
常规调度 | 3109.7 | 40.9 |
优化调度 | 3356.0 | 7.9 |
表1. 梯级水电站群调度结果
1) 以水定电
现以三峡水电站为例,根据常规调度结果及优化调度结果,统计年均发电出力和年均流量,以1957~1986年作为率定期,建立水–能转化关系。为检验上述水–能关系,选取1987~2012年作为检验期,以三峡水电站年出库流量为输入计算年发电量,结果如表2所示。经观察,不论采取常规调度还是优化调度,对应的水–能关系线性相关性均较强,与式(4)的分析结果相符。
时期 | 调度方式 | 根据出库流量推求发电量 | 根据发电量推求出库流量 | ||||
---|---|---|---|---|---|---|---|
调度模拟电量 (亿kWh) | 水能关系拟合电量 (亿kWh) | 出库流量拟合误差 (%) | 调度模拟水资源量 (亿m3) | 水能关系拟合出库水量 (亿m3) | 电量拟合误差 (%) | ||
率定期 | 常规调度 | 901.64 | 902.07 | 0.01 | 4311.27 | 4311.38 | 0.05 |
优化调度 | 937.99 | 938.01 | −0.01 | 4321.60 | 4321.54 | 0.01 | |
检验期 | 常规调度 | 896.05 | 874.79 | 0.02 | 4109.98 | 4110.74 | −2.37 |
优化调度 | 911.06 | 909.05 | 0.69 | 4152.38 | 4181.01 | −0.22 |
表2. 三峡水电站发电量及水资源量拟合结果
表3列出了上游21座水电站在不同的调度方式下的特性参数a、b,结果表明:除金安桥等个别电站外,大部分水电站均能建立相关性较强的线性水–能关系。
水电站 | 常规调度 | 优化调度 | ||||
---|---|---|---|---|---|---|
a | b | R2 | a | b | R2 | |
梨园 | 0.02 | 81.06 | 0.6633 | −0.01 | 111.36 | 0.0200 |
阿海 | 0.03 | 54.77 | 0.7728 | 0.03 | 54.55 | 0.7810 |
金安桥 | −0.01 | 124.66 | 0.0973 | −0.01 | 112.91 | 0.0012 |
龙开口 | 0.02 | 50.70 | 0.7338 | −0.01 | 75.28 | 0.0455 |
鲁地拉 | 0.02 | 64.13 | 0.6895 | 0.02 | 63.92 | 0.6988 |
观音岩 | 0.03 | 90.52 | 0.5831 | 0.03 | 86.53 | 0.6190 |
溪洛渡 | 0.03 | 500.82 | 0.1624 | 0.16 | 48.55 | 0.9924 |
向家坝 | 0.02 | 227.20 | 0.6262 | 0.08 | 32.15 | 0.9978 |
---|---|---|---|---|---|---|
锦屏 | 0.05 | 130.12 | 0.7013 | 0.06 | 98.70 | 0.7446 |
二滩 | 0.04 | 126.28 | 0.6978 | 0.06 | 95.91 | 0.7548 |
紫坪铺 | 0.12 | −23.57 | 0.5501 | 0.01 | 10.51 | 0.1878 |
瀑布沟 | 0.09 | 54.91 | 0.8963 | 0.14 | 2.15 | 0.9817 |
碧口 | 0.03 | 7.71 | 0.8575 | 0.03 | 6.53 | 0.8786 |
宝珠寺 | 0.07 | 2.62 | 0.9374 | 0.08 | −0.33 | 0.9848 |
亭子口 | 0.04 | 12.02 | 0.8411 | 0.06 | 1.46 | 0.9836 |
草街 | 0.01 | 19.32 | 0.5600 | 0.01 | 20.09 | 0.5311 |
构皮滩 | 0.13 | 9.13 | 0.8309 | 0.14 | 5.44 | 0.9750 |
思林 | 0.04 | 11.89 | 0.8507 | 0.05 | 6.47 | 0.9344 |
沙陀 | 0.03 | 15.90 | 0.7366 | 0.04 | 14.61 | 0.7697 |
彭水 | 0.03 | 28.73 | 0.7868 | 0.05 | 11.95 | 0.9268 |
三峡 | 0.05 | 362.62 | 0.8338 | 0.06 | 252.68 | 0.8652 |
表3. 单个水电站水–能关系拟合结果
2) 以电定水
为估计单库水资源量,以三峡水电站为例,建立能–水关系。为检验上述能–水关系,以三峡水电站出力为计算依据,推求三峡水库的水资源量。计算结果如表2所示。结果表明,单库的能–水关系拟合误差可控制在1%左右,拟和效果较好。因此,可根据单个水电站发电量推求单库水资源量。
1) 直接拟合
1、以水定电
现以1957~1986年作为率定期,将水电站出力进行累加,并以三峡水电站出库流量作为流域出口流量,建立水–能关系,如图2所示。为检验上述水–能关系,选取1987~2012年作为检验期,以三峡水电站出库流量为计算依据,代入上述水–能关系计算公式中,推求整个流域拟合的年发电量,计算结果如表4所示。
图2. 水电站群的水–能关系率定结果
时期 | 调度方式 | 根据出库流量推求发电量 | 根据发电量推求水资源量 | ||||
---|---|---|---|---|---|---|---|
调度模拟电量 (亿kWh) | 水能关系拟合电量 (亿kWh) | 电量拟合误差 (%) | 调度模拟水资源量 (亿m3) | 水能关系拟合水资源量 (亿m3) | 水资源量拟合误差 (%) | ||
率定期 | 常规调度 | 2949.33 | 2949.68 | 0.01 | 4311.27 | 4311.19 | −0.01 |
优化调度 | 3239.39 | 3239.32 | −0.01 | 4321.60 | 4321.64 | 0.01 | |
检验期 | 常规调度 | 2910.07 | 2887.33 | −0.78 | 4109.98 | 4247.56 | 3.35 |
优化调度 | 3246.44 | 3146.15 | −3.09 | 4152.38 | 4329.67 | 4.27 |
表4. 水电站群发电量及水资源量拟合结果
上述结果表明,整个流域的发电量与流域的出库流量同样能建立较强的线性水–能关系。在率定期及检验期拟合发电量与调度发电量存在一定的误差,但误差可控制在4%左右,说明该水–能关系公式拟合效果较好,可用于流域电量估算。
2、以电定水
为估计流域水资源量,建立能–水关系,如图2所示。为检验该关系,以21座水电站总出力为计算依据,代入拟合能–水关系计算公式中,推求整个流域的水资源量,计算结果如表4所示。
上述结果表明,整个流域出口流量与流域水电站发电量同样能建立较强的线性能–水转化关系。在率定期及检验期拟合水资源量量与调度模拟水资源量存在一定的误差,但误差可控制在5%以内,说明该能–水转化公式拟合效果较好,可根据水电站群发电量推求流域水资源量。
2) 权重拟合
由于电站规模越大,水能转化效率越高,为加强水–能关系的拟合效果,以各水电站的装机容量大小代表各电站的权重,将各水电站出力加权求和并与流域出口水电站流量建立联系,拟合结果如图3所示。结果表明,相对于直接累加,考虑加权后的水–能转化关系拟合效果更好。
本研究选取长江上游21座大型梯级水电站群为研究对象,采用常规调度和确定性优化调度方式,由此建立了宏观的水–能转化关系,可直接实现流域内电站的发电量与水资源量的相互估算,主要结论如下:
图3. 水电站群的加权率定结果
1) 推求单个水电站的特性参数,建立适用于各水电站的水–能转化关系;
2) 基于聚合思想,可构建各水电站电量累加值与流域水资源总量的宏观年尺度水–能转化关系;以各电站装机容量作为权重,推求的水–能转化关系拟合效果更佳。
3) 以水–能转化关系为基础,可通过流域实际发电量推求流域水资源量。
本研究还存在一些不足,可在以下几个方面进一步展开:
1) 部分水库单库的拟合效果不佳,应进一步分析原因并考虑其他优选的拟合方式。
2) 可以考虑更多的水库权重确定方式,并加以比较,以确定最佳的权重确定方法,综合考虑流域内各水电站的影响。
龚文婷,刘 攀. 长江上游梯级水电站群的水能宏观关系研究Relationship between Water and Energy for Cascade Hydropower Stations in Upper Reaches of the Yangtze River[J]. 水资源研究, 2020, 09(01): 106-114. https://doi.org/10.12677/JWRR.2020.91011
https://doi.org/10.1016/j.apenergy.2017.07.046
https://doi.org/10.1016/j.jclepro.2017.08.167
https://doi.org/10.1016/j.apenergy.2018.04.094
https://doi.org/10.1016/j.jhydrol.2009.07.026
https://doi.org/10.12677/JWRR.2015.41003